Print Friendly, PDF & Email

Pradhan Mantri Gram Sadak Yojana-lll (PMGSY-III)

Topics Covered:

Government policies and interventions for development in various sectors and issues arising out of their design and implementation.

Infrastructure: Energy, Ports, Roads, Airports, Railways, etc.

Pradhan Mantri Gram Sadak Yojana-lll (PMGSY-III)

What to study?

For prelims and mains: features and significance of PMGSY, need for enhanced rural connectivity.

Context: Phase III of Pradhan Mantri Gram Sadak Yojana (PMGSY) has been launched.

For Prelims and Mains:

Features of Pradhan Mantri Gram Sadak Yojana-lll (PMGSY-III):

  1. Under the PMGSY-III Scheme, it is proposed to consolidate 1,25,000 Km road length in the States.
  2. It involves consolidation of Through Routes and Major Rural Links connecting habitations to Gramin Agricultural Markets (GrAMs), Higher Secondary Schools and Hospitals.
  3. The funds would be shared in the ratio of 60:40 between the Centre and State for all States except for 8 North Eastern states and Himachal Pradesh & Uttarakhand for which it is 90:10.

Background:

A total of 5,99,090 Km road length has been constructed under the scheme since inception till April, 2019 (inclusive of PMGSY-I, PMGSY-II and RCPLWEA Scheme.

PMGSY-I:

PMGSY was launched in December, 2000 with an objective to provide single all-weather road connectivity to eligible unconnected habitation of designated population size (500+ in plain areas and 250+ in North-East, hill, tribal and desert areas as per Census, 2001) for overall socio-economic development of the areas.

Road Connectivity Project for Left Wing Extremism Area (RCPLWEA):

Launched in the year 2016 as a separate vertical under PMGSY to provide all-weather road connectivity with necessary culverts and cross-drainage structures in 44 districts (35 are worst LWE affected districts and 09 are adjoining districts), which are critical from security and communication point of view. Under the Scheme, 5,066 Km road length has been sanctioned.

Sources: the Hindu.